The White River Bridge between Enumclaw and Buckley will need to be sanded to get off rust and old, peeling paint before a new coat can be put on. Photo courtesy WSDOT

The White River Bridge between Enumclaw and Buckley will need to be sanded to get off rust and old, peeling paint before a new coat can be put on. Photo courtesy WSDOT

State survey seeks information from SR 410 drivers

Make sure to let WSDOT know how you think traffic between Bonney Lake and Enumclaw can be improved by Sunday, July 22.

Frustrated by traffic tie-ups on state Route 410? Tired of a commute between Enumclaw and Bonney Lake that takes 30 minutes in the morning but an hour in the afternoon?

Well, the Washington State Department of Transportation is ready to take your feedback. The department is encouraging the public to participate in an online survey to identify ways to reduce congestion on SR 410 between 234th Ave. E. in Bonney Lake (eastern city boundary line) and Garrett Street in Enumclaw (near QFC and others).

Those wishing to participate should act fast. The survey went live last week and will be available only until 11:59 p.m. this Sunday, July 22.

“The information we receive from this survey will help us identify potential strategies for reducing congestion along the corridor,” said WSDOT Planning Manager Dennis Engel. “We encourage people to give us their thoughts.”

The survey includes questions about 410’s No. 1 choke-point – the White River Bridge – as well as potential improvements for travelers who ride bicycles or walk. Regarding the busy bridge between Buckley and Enumclaw, the DOT website indicates long-term solutions to 410 traffic could include “replacing or expanding” the bridge.

The survey asks big picture questions like top priorities for travelers. Is it reducing congestion or adding safety features? Is it all about motor vehicles or should the DOT be looking more at bicycle and pedestrian issues? The survey provides opportunities for individual thoughts and suggestions.

Other, more specific questions, seek information like:

• how often do you travel on SR 410 between Bonney Lake and Enumclaw?

• why do you use 410 (business, shopping, medical appointments, etc.)?

• do you schedule 410 trips to avoid times of peak congestion?

• do you use an alternate route to avoid 410 (and which road)?

The survey is part of the SR 410 traffic study that carries a $300,000 price tag. A final report is expected this winter.

Lobbying for the 410 study was Plateau Cities Collaboration, a group that started with city leaders from Enumclaw and Buckley and came to include Bonney Lake and representatives from both King and Pierce counties.

A fact sheet prepared by the PCC notes that 2,200 vehicles travel SR 410 from Enumclaw to Buckley on a typical weekday, between the hours of 4 and 6 p.m. The DOT grades roadways by “level of service” and has provided an “F” to the intersection of 410 and Park Avenue in Buckley; the ratings don’t come any lower.

TWO PROJECTS IMPACTING 410

The Department of Transportation currently has two projects that will impact SR 410 drivers – one already started and another to be tackled soon.

Already under way is a project to repaint the White River Bridge, an effort that is budgeted at $2.8 million. Costs escalate when work is done over salmon-bearing waterways, like the White River. The steel bridge was built in 1949 and last painted in 1988.

Crews will first sand the rust and old paint from the bridge, before applying new paint. During work hours – mostly at night – there will be two narrow lanes to accommodate traffic. Occasionally, one lane will be closed and there will be alternating traffic.

Additionally, work is expected to begin later this summer on a 410 “signal rebuild” project in Buckley.

The DOT will have contractors replacing signal lights at the intersection of the highway at Park Avenue, Main Street and Mundy Loss Road. The use of current technology and equipment should allow for better coordination, helping with traffic flows.

More in News

Changes to Black Diamond city code address attorney contracts

The city said it is clarifying the mayor has the power to hire and fire attorneys; some residents say this gives the mayor too much power.

Trash talk: Enumclaw renews solid waste pact with King County

Additionally, the public comment period for the Cedar Hills Regional Landfill in Maple Valley is open through Aug. 26.

Nuevo programa de biblioteca que incorpora grupos de recursos comunitarios

A new library program is having a mini-resource fair with Sea Mar and Colectiva Legal del Pueblo.

Candidates sought for posts where none filed

South Prairie and Wilkeson need someone to file to be a council member — the due date is Aug. 15.

Raising glasses, and funds, for wounded vets

The Aug. 15 “Pint Night” at Headworks Brewery will go to the Gary Sinise Foundation.

King County’s Prop. 1 parks levy is passing

Initial results from the Aug. 6 primary King County Council races are also in.

Preliminary results for August 2019 primary elections

The parks levy is passing, and Paul Fisher and Eric Heintzinger are leading the Enumclaw Fire Department commissioner race.

Work started on solution for Spiketon Bridge closure

The new temporary bridge, which will be two-lanes large and have no weight restrictions, is expected to be completed in October.

Next state park “free day” Aug. 25 | Washington State Parks

There are several state parks Plateau residents can enjoy nearby.

Suggestions for downtown lots pitched to City Council

The empty lot next to The Local coffeeshop could potentially be used for plant or art sales, or incorporated into the Sundays on Cole events.

Spring Chinook salmon. Photo courtesy Michael Humling, US Fish and Wildlife Service
State awards millions for salmon recovery

Puget Sound counties received more than $45 million.

Grocery store workers picket across King County

Union members are asking Kroger for living wages and more scheduling predictability.